yes, the way i have seen it done is weld a fitting where the pcv is and run a line from the fitting to the catch can and from the catch can to the pvc. the line that u run from the catch should be able to fit over the bottom of the pcv with a clap. then run the line from the pcv to the IM.





Reply With Quote