I went to Balanced to get my car worked on. They said that it would be a 3-4 hour job. I had told them to look in to doing some little extra things, they said ok and that they would call me with a price one they got into the car. They said that the labor would be $85 per hour. So i was thinking that it would be a price around $300-$400, with parts. I never got a phone call, until the day that it was done, it turned out to be $1200 plus dollars. My thing is that i never got a phone call with a price on anything that was done, until it was all done. To add to it the Manager (AKA Supervisor, shop worker) gave both me and my wife the runaround. Any way to make a long story short, he finally said that he didn't want to deal with my car any more and supposedly cut a $1200 bill down to $660. Everything i guess kind of worked, even though the job that was down wasn't the the greatest. I wasn't to happy on some of the welding that was done.




 
			
			 
					
						 
			 Balanced Peroformace
 Balanced Peroformace
				 
					
					
					
						 Reply With Quote
  Reply With Quote 
					
						 
 
 Originally Posted by 91blackteg
 Originally Posted by 91blackteg
					
				
 
			 
						 
			 
			
 
					
				 
			 
			 
			
 
			 
			