well, i have ran most of the plumbing to the other side of the shower, i still have to run it for the body sprays, and hand-held bar sprayer, but that shouldnt take to long.
got the shower pan all prepped to build it with morter, and the liner, and got the subfloor cut out out and replaced. ai also have almost all of the concrete backer board on the floor, and most of it on the tub surround, so, its almost ready for tile! (as soon as we finish the showerpan)