update, about to tackle the following to do list, should take about 3 weekends or so. Will post pictures soon.
-Pressure wash engine and engine bay.
-Remove intake manifold, throttle bodies, etc sand blast and refinish
-remove plastic timing covers, clean and asses, paint or recover if needed.
-remove throttle warmers and all coolant lines associated with removal.
-remove Pressure Regulator Vacuum Relief
-remove exhaust manifords and asses, replace or refinish
-remove all remaning hicas sytem components.
-remove foglight assemblies and make or buy ducts
-remove tweed interior panels abd clean residue off
-remove engine harness and simplify, delete uneeded circuits and asscoisted wiring from harness add in wiring needed for electric fan, recover.
-remove turbos, clean and dissasemble
-rebuild turbos or purchase ugraded ones.
-remove and replace with 60k to 120k mile service kit:
1 Timing Belt
1 Timing Belt Tensioner
4 Camshaft oil seals
1 Crankshaft oil seal
2 VTC Springs
2 VTC Cover plate O-rings
2 Short Water Hoses
1 Thermostat
3 Drive Belts ALT, AC, PWS (Optional)
1 Water Pump
1 Crankshaft timing sprocket
-remove stock fan and replace with electric fan
-clean and refinish or replace stock radiator with upgrade
-remove fan shroud and discard, fab up new cover in carbon.