well my uncle aka (tegg3r) and I have finally decided to slap "some" goodies on his car. long story short ill let the pics show the details enjoyoh and sorry for the crappy iphone pics
started to disconnect all wires and hoses
then took the oil pan off to change out the rods and pistons
head,headers,manifold and all belts are off
took the pistons out...
old pistons
got down and dirty and took all four out
out with the old...
and in with the new...
time to put all new ones back in and i must say very shiny
then put in ARP head studs =)
waited for some goodies for the head that came in...
took everything out to get to the springs and retainers... these were a pain in the ass to install because of the "keepers"
after the springs were in, we slapped the VC back on tighten everything and put it back on the block.. also installed AEM fuel rail, and RC 440 injectors... also clean the crapped out of the manifold
mounted up the turbo/mani.... had to shave a moon shape thing in the block cause the turbo was touching and was causing the manifold not to fit on one side....
decided to paint the VC... measured and centered the IC for perfect fitment
then after we started to get all pipings connected clamps and all tighten this is the final results
and one more shot....
hope you guys enjoyed and thanks for looking will have video of her up and running![]()




oh and sorry for the crappy iphone pics

















Reply With Quote