yeah, the entire pit lane and the hill on the outside of turn 12 was dug up and trucked over to the lowest part of the esses starting at turn 4 (technically the entire area between 4 and 5 was raised).Originally Posted by simontibbett
yeah, the entire pit lane and the hill on the outside of turn 12 was dug up and trucked over to the lowest part of the esses starting at turn 4 (technically the entire area between 4 and 5 was raised).Originally Posted by simontibbett