That is exactly what I was going to do for the time being but this is for down the road.
After I get a few more things done on the engine.
I will move back over to the car and work on the tucked brake lines.
I also gotta pull the pedal assembly out and weld a bracket for the hydraulic clutch.
I really wanted to go with EF hush performace hydro conversion but I'm trying to save some cash.
I'm still lacking a couple parts to finish the build I made a to do list and it includes figuring out what injectors to run and what fuel rail to get since my feed lines are on passenger side of engine
I still have to get a clutch CV axles half shaft obd 0 to obd 1 and make the custom harness. Was going to just go with a rywire or chasebays but that will have to be something I get later on if I wanna get it back on the road sooner than later
sent from old rotary phone using tapatalk