get in the car after its ready to crank hold gas to the floor crank it up and let it bang on the rev limter till warmed up.
get in the car after its ready to crank hold gas to the floor crank it up and let it bang on the rev limter till warmed up.
I do rb20 and rb25 wiring into s13 and s14's 300.00 shipped 24hr turn around turn ket start guaranteed! PM me for more details!