Immediately probably Ceramic Coating Header/Uppipe then Wrapping some of the downpipe for spool. Sleeving some of the I/C Piping. Trying out the HKS Fan Controller here tuesday. Finish the Heat Reduction stuff in the Car, then go for a bit more power.
Later on Clutch and possibly meth injection.