finally started putting some of the car back together and finishing my mock up stuff for all of the piping and intercooler/radiator mounting. it feels like i might finally be getting somewhere with it. figured i'd take some pics before it's all back together.
changes made are:
-topmount turbo manifold, welded on T2 flange to keep my GT2871R turbo.
-new outlet to downpipe fabricated and heat wrapped, downpipe modified to clear framerail under car and tuck up closer to floor.
-intercooler relocated inside core support like dan and tracy's cars, should shorten intercooler piping considerably and help spoolup.
-radiator moved back 3" to accomodate intercooler setup.
-stitch welded various seams on the core support and painted everything.
after i get all this done and running i'm going to build ducting to pull all the air from the front directly into the intercooler/radiator and probably make an isolator box for the air filter (also ducted to the outside of the engine bay). this was just going to be a topmount changeover, dunno what happened :lol:
next on the list... KAAZ and paint.




 
			
			 
					
						 
					
						 some progress pictures
 some progress pictures
				


 
					
					
					
						 Reply With Quote
  Reply With Quote 
			
 
			 
			 Originally Posted by confusedkorean
 Originally Posted by confusedkorean
					
				
 
			
 
						 
					
						 
					
						


 .
.
						 
			
 
			

 
			 
						 
      
						 
			